SR 520/US 82 at Big Creek 3 Miles West of Hoboken
Surface Transportation
Project Description
This project consisted of replacing the structural deficient westbound bridge on a four-lane divided road with a depressed grass median.
Project Description
-
Project Location:
Brantley County, GA
-
Project Owner:
Georgia Department of Transportation
Holt Consulting Company Contributed:
- Project Management
- Concept Development
- Preliminary
- Right-of-Way
- Final Plans
- Construction Services
Project Highlights
This project required an on-site detour across the existing grass median utilizing temporary pavement to the existing eastbound bridge during the replacement of the westbound bridge.