Emergency Bridge Package 2018-2A

Surface Transportation

Project Description

The design-build bridge project consisted of the replacement of the S-51 (E. Academy St.) Bridge over an Unnamed Stream in Dillon County, the S-33 (Davids Pond Rd.) Bridge over Naked Creek in Marlboro County, and the S-400 (Level Green Church Rd.) Bridge over Herndon Branch in Marlboro County due to flooding from Hurricane Florence. This project consisted of all work necessary to remove the existing bridges and to construct new bridges, including the associated roadway and drainage work necessary to tie the new approaches to the existing roadway.

Project Description

  • Project Location:

    Marlboro and Dillon Counties, SC

  • Project Owner:

    SCDOT

Holt Consulting Company Contributed:

  • Roadway Design
  • Quality Assurance Reviews
  • Seismic Design

Project Highlights

The project was awarded the 2020 American Council of Engineering Companies (ACEC) Engineering Excellence Award. The Team replaced all three bridges, improved an intersection, repaired a leaking sewer line, and significantly improved safety at all three sites. SCDOT’s expedited schedule required the design, permitting, demolition and construction of all three bridges in 200 days, which was accomplished.

Back to top