Skip to Content

T-Hangar Development Area

Aviation

Project Description

The project included new nested T-Hangars at the Mt. Pleasant Regional Airport. The T-Hangars included a 9-unit and 15-unit building that was designed to accommodate general aviation aircraft. The hangars include electric bi-fold doors, LED lights, and taxilane access to the apron pavement. In addition, the project included a detention pond, new storm water drainage system, utility work, and apron lighting.

Project Description

  • Project Location:

    Mt. Pleasant Regional Airport (LRO) | Mt. Pleasant, SC

  • Project Owner:

    Charleston County Aviation Authority

  • Contract Type:

    5-Year On-Call Contract

Holt Consulting Company Contributed:

  • Design and Bidding
  • Project Management
  • Permitting
  • Construction Phase Services

Project Highlights

Because of the location, the project involved coordination with multiple local, state, and federal permitting agencies to ensure a successful project. During design, several layouts were considered to ensure that the available site space could be maximized. The airport has an extensive waiting list for hangar space and CCAA wanted to alleviate the demand as much as possible. The project was completed on-time and under budget.